M.C.I.
  • LANGUAGE
83 results:
11. RWTH Aachen  
C.A.R.L. der RWTH Aachen The Central Auditorium for Research and Learning (C.A.R.L.) is a lecture hall building planned since 2009 and put into operation in 2017 at the Rheinisch-Westfälische…  
12. Voest Finanzzentrum  
Voest Finanzzentrum The building in Linz serves as the sales and finance center for the steel and technology company Voestalpine. Construction period: 2010 to September 2011 Acoustic requirements…  
13. Wien Mitte  
Wien Mitte "The Mall" The shopping center, with its 30,000 m² of retail space spread across 3 levels, is the largest of its kind in the center of Vienna. It opened in two phases in 2012/13. The…  
14. Clip-in system  
Clip-in system The clip-in system allows individual elements (ceiling panels or tiles) to be securely attached to a substructure without screws or complicated mounting brackets. This technique…  
15. Function  
Heating & Cooling Acoustics Hygiene Ball impact resistance Function Our numerous ceiling constructions also provide great added value through individual functions. In addition to…  
16. Surfaces  
Perforations Acoustic inserts Colors Expanded metal Print Surfaces The surface and its qualitative composition of a ceiling play a significant role in the aesthetics of a room. Our…  
17. Jobs  
We are looking for reinforcement! On this page, you will find an overview of our current job vacancies and apprenticeships.  
18. Apprenticeships  
Apprentice in Metal Construction and Sheet Metal Technology (m/f/d) Our Shared Training Goal: Manufacture metal constructions, housings, and components from sheet metal Process steel, copper, or…  
19. References  
Our references As a pioneer in our field, we have a wide range of satisfied customers and successfully completed projects to our name. Our company is regularly audited by accredited testing…  
Search results 11 until 20 of 83